EXPERIENCE FOR 2016

DESCRIPTION
CLIENTS
STATUS
Engineering, Supply , Installation and Commissioning of VFD ABB ACS880 for Air Cooler Fan Including VFD Protection Relay PETRONAS Penapisan (Terengganu) Sdn Bhd Completed
Testing and commissioning of TNB Sub Station: PE Booster Pump Paya Besar & PE Bomba Kuala MYM Tok Pong Sdn Bhd Completed
Provision for ST Electrical Competent Engineer CMC Completed
Relay Calibration for Bank Islam Dungun ENL Engineering & Services Completed
Relay Calibration for HVAC Control Panel TCOT ABB RC Cell Alam Dingin Engineering Sdn Bhd Completed
Relay replacement, setting, testing and commissioning at Paka Yard PFCE CG Completed
Provision for Electrical Energy Manager for Petronas Chemical MTBE Sdn Bhd. PFCE-CG Sdn Bhd Completed
Provision of Manpower Supply with PPE and Equipment for Optimal VSD ABB ABB Malaysia Sdn Bhd Completed
Provision of Energy Manager Malay-Sino Chemical Industries Completed
Supply of EX LED for TCOT P380 Project Dayang Enterprise Holdings Completed
Provision of Energy Manager Rhong Khen Timbers Sdn Bhd Completed
Provision of Inspection Electrical Competent Engineer, Energy Manager & EPC LED Lighting Syarikat Air Terengganu Sdn Bhd Completed
Relay calibration and commissioning supply at IWK Damansara Kuantan UV Base Completed
Relay calibration of KTCC Sewage Treatment Plant SP Multitech Sdn Bhd Completed
Relay calibration and switchgear maintenance including Capacitor Bank, Capital Mall, Kuantan Padini Completed
Provision for Electrical Competent Engineer at Ram-Bytes Completed
Engineering & Supply of Motor Protection Relay ABB REM610 Hunstman Tioxide Completed
EF, ELR & MPCB calibration for Dulang A HVAC Panel Alam Dingin Engineering Sdn Bhd Completed
EF, ELR & MPCB calibration for Dulang C HVAC Panel Alam Dingin Engineering Sdn Bhd Completed
EF, ELR & MPCB calibration for Dulang D HVAC Panel Alam Dingin Engineering Sdn Bhd Completed
Network Analyzer upgrade and Capacitor Bank Maintenance Kerteh Terminal Completed
ABB MS116 MPCB calibration for Malakai HVAC Panel Alam Dingin Engineering Sdn Bhd Completed