DESCRIPTION |
CLIENTS |
STATUS |
Engineering, Supply , Installation and Commissioning of VFD ABB ACS880 for Air Cooler Fan Including VFD Protection Relay |
PETRONAS Penapisan (Terengganu) Sdn Bhd |
Completed |
Testing and commissioning of TNB Sub Station: PE Booster Pump Paya Besar & PE Bomba Kuala |
MYM Tok Pong Sdn Bhd |
Completed |
Provision for ST Electrical Competent Engineer |
CMC |
Completed |
Relay Calibration for Bank Islam Dungun |
ENL Engineering & Services |
Completed |
Relay Calibration for HVAC Control Panel TCOT ABB RC Cell |
Alam Dingin Engineering Sdn Bhd |
Completed |
Relay replacement, setting, testing and commissioning at Paka Yard |
PFCE CG |
Completed |
Provision for Electrical Energy Manager for Petronas Chemical MTBE Sdn Bhd. |
PFCE-CG Sdn Bhd |
Completed |
Provision of Manpower Supply with PPE and Equipment for Optimal VSD ABB |
ABB Malaysia Sdn Bhd |
Completed |
Provision of Energy Manager |
Malay-Sino Chemical Industries |
Completed |
Supply of EX LED for TCOT P380 Project |
Dayang Enterprise Holdings |
Completed |
Provision of Energy Manager |
Rhong Khen Timbers Sdn Bhd |
Completed |
Provision of Inspection Electrical Competent Engineer, Energy Manager & EPC LED Lighting |
Syarikat Air Terengganu Sdn Bhd |
Completed |
Relay calibration and commissioning supply at IWK Damansara Kuantan |
UV Base |
Completed |
Relay calibration of KTCC Sewage Treatment Plant |
SP Multitech Sdn Bhd |
Completed |
Relay calibration and switchgear maintenance including Capacitor Bank, Capital Mall, Kuantan |
Padini |
Completed |
Provision for Electrical Competent Engineer at |
Ram-Bytes |
Completed |
Engineering & Supply of Motor Protection Relay ABB REM610 |
Hunstman Tioxide |
Completed |
EF, ELR & MPCB calibration for Dulang A HVAC Panel |
Alam Dingin Engineering Sdn Bhd |
Completed |
EF, ELR & MPCB calibration for Dulang C HVAC Panel |
Alam Dingin Engineering Sdn Bhd |
Completed |
EF, ELR & MPCB calibration for Dulang D HVAC Panel |
Alam Dingin Engineering Sdn Bhd |
Completed |
Network Analyzer upgrade and Capacitor Bank Maintenance |
Kerteh Terminal |
Completed |
ABB MS116 MPCB calibration for Malakai HVAC Panel |
Alam Dingin Engineering Sdn Bhd |
Completed |