DESCRIPTION |
CLIENTS |
STATUS |
EPCC 4 Unit VFD Powerflex 753 AC drive at NH3 |
Kertih Terminals Sdn Bhd |
Completed |
Supply Junction Box |
Petronas Carigali Sdn Bhd |
Completed |
SupplyTopmost EX-BCT 36-600 |
Petronas Carigali Sdn Bhd |
Completed |
General Inspection & Maintenance of Electrical System |
E&P O&M Services Sdn Bhd |
Completed |
Provision of Manpower, Equipment, Tools and Consumables for Calibration and Maintenance of Protection Relay Onboards FPSO Bunga Kertas |
FPSO Ventures Sdn Bhd |
Completed |
EPCC Allen Bradley VFD 7.5kW Model 22C-D017N103 |
Malay Sino Chemicals Industries Sdn Bhd |
Completed |
Provision Contract for KR1 and KR2 Substation Protection Relays Replacement Services(Contract 2 Years) |
PETRONAS Penapisan (Terengganu) Sdn Bhd |
Completed |
Gen Set Registration |
Kencana Jaya Mas Sdn Bhd |
Completed |
Visiting Engineer for LHDN |
Lembaga Hasil Dalam Negeri |
Completed |
Recalibration Protection Relay Main Sub |
Wasco Coatings Malaysia Sdn Bhd |
Completed |
Recalibration Protection Relay Main Sub |
Wasco Coatings Malaysia Sdn Bhd |
Completed |
Relay Calibration at Eastman Gebeng |
FLEXSYS CHEMICALS (M) SDN BHD |
Completed |
Relay Calibration at PCESB |
Esteem Energy Engineering Sdn Bhd |
Completed |
Relay Calibration at KSB |
Rotorniaga Sdn Bhd |
Completed |
Relay Calibration at BASF Gebeng |
Noble GA Engineering & Services |
Completed |
Protection Relay and Device calibration at GPP3 PGB |
Paka Plant General Maintenance Sdn Bhd |
Completed |
Protection Relay and Device calibration at FGRU PGB |
Paka Plant General Maintenance Sdn Bhd |
Completed |
Protection Relay and Device calibration at GPP4 PGB |
Paka Plant General Maintenance Sdn Bhd |
Completed |
Application TNB Supply for PBJV Group |
PBJV Group Sdn Bhd |
Completed |
Relay Calibration at Instep |
HRSB Power Control Sdn Bhd |
Completed |
To Service ACB and VCB |
Esteem Energy Engineering Sdn Bhd |
Completed |
Electrical Loose Supply |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
Protection Relay and Device calibration at GPP1 PGB |
Paka Plant General Maintenance Sdn Bhd |
Completed |
General Electrical Maintenance and Services for Bertam MAY 2018 (4th Demob) |
Kencana Jaya Mas Sdn Bhd |
Completed |
Relay Calibration in TK Works |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
Relay Calibration |
AS Power |
Completed |
Relay Calibration at KSB |
Rotorniaga Sdn Bhd |
Completed |
Gen Set Registration |
Kencana Jaya Mas Sdn Bhd |
Completed |
Provision Electrical Supply Application |
RAM-Bytes Sdn Bhd |
Completed |
Supply Cable Gland |
RAM-Bytes Sdn Bhd |
Completed |
Supply ans Install MPR 47s at PCSB |
RAM-Bytes Sdn Bhd |
Completed |
Relay Calibration at Sub 1 PPTSB |
PETRONAS Penapisan (Terengganu) Sdn Bhd |
Completed |
To Measure Max Load and Load Profiling at Klang Valley (Data Logger) |
Tenaga Nasional Berhad |
Completed |
Rental Gen Set and Air Compressor |
Kertih Terminals Sdn Bhd |
Completed |
Relay Calibration at KSMF |
Kertih Terminals Sdn Bhd |
Completed |
Supply and Install MPR 45 |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
Provision of Switchboard and Panel Cleaning, Services and Testing for FSO Sepat |
Vertigo Tech (M) Sdn Bhd |
Completed |
Ligthing Dulang Angsi Project |
RAM-Bytes Sdn Bhd |
Completed |
EPIC for 2 unit VFD Powerflex 753 AC Drive at Melor Tangga Barat Allen Bradley |
Petronas Carigali Sdn Bhd |
Completed |
VFD Melor Tangga Barat Allen Bradley (Site Visit) |
Petronas Carigali Sdn Bhd |
Completed |
Gen Set Registration |
AHG Automation |
Completed |
To Supply LED Strong Light (OKTECH) |
Sapura Energy Exploration and Production |
Completed |
Supply, Install, Protection Relay Calibration and Modification Electrical Work |
PETRONAS Gas Berhad |
Completed |
Genset Registration |
Puspakom Sdn Bhd |
Completed |
Site Verification and SLD Upgrading |
PETRONAS Dagangan Berhad |
Completed |
Protection Relay Calibrate and Modify |
PETRONAS Gas Berhad |
Completed |
To Provide Solar Street Lighting |
Kemaman Bitumen Company Sdn Bhd |
Completed |
Supply, install, Calibrate and Testing, and Commisioning Panel at IOC Building |
Wazam Venture Sdn Bhd |
Completed |
Automation Testing for MCC for Offshore Installation |
Exact Automation Sdn Bhd |
Completed |
Gen Set Registration |
HRSB Power Control Sdn Bhd |
Completed |
Service,Fabricate, Testing and Commisioning MCC |
Wazam Venture Sdn Bhd |
Completed |
Site Verification and SLD Upgrading |
PETRONAS Dagangan Berhad |
Completed |
Partial Discharge Online Inspection |
Kertih Terminals Sdn Bhd |
Completed |
To Supply Relay and Relay Calibration at OGT |
RAM-Bytes Sdn Bhd |
Completed |
Relay Calibration at PCPSB |
Esteem Energy Engineering Sdn Bhd |
Completed |
Relay Calibration at PCESB |
Esteem Energy Engineering Sdn Bhd |
Completed |
Genset Registration |
Puspakom Sdn Bhd |
Completed |
Energy Manager Servise Report |
Arkema Thiochemicals Sdn Bhd |
Completed |
Perform Stability Test |
ETD Makmur (M) Sdn Bhd |
Completed |
To Supply Cable Tie |
Kemaman Bitumen Company Sdn Bhd |
Completed |
To Supply Topmost Lighting |
RAM-Bytes Sdn Bhd |
Completed |
To Supply Electrical Supervisig Engineer to Hunstman P&A Asia |
Huntsman Tioxide (M) Sdn Bhd |
Completed |
Relay Calibration at PPTSB |
Wazam Venture Sdn Bhd |
Completed |
To Supply and Install TOR |
Wazam Venture Sdn Bhd |
Completed |
Generator 2000KVA Control Panel Troubleshooting/td>
| Wazam Venture Sdn Bhd |
Completed |
To Supply Entes Power Supply |
Teliti Infotech Sdn Bhd |
Completed |
To Supply Power Supply |
Teliti Infotech Sdn Bhd |
Completed |
To Supply Genset and AMF Panel Maintenance |
Wazam Venture Sdn Bhd |
Completed |
To Supply Genset Maintenancefor KR2 |
Wazam Venture Sdn Bhd |
Completed |
To Supply Genset Maintenancefor KR1 |
Wazam Venture Sdn Bhd |
Completed |